Proudly American
ChargeHomeSOLUTIONS

Commercial charging

Commercial EV charging for workplaces, retail, and fleets.

Commercial EV charging stations for workplaces, multifamily, retail, and fleets. We handle site assessment, load management, networking, and rebate paperwork.

What’s included

  • Site assessment and load calculation for any property type
  • Load management to avoid costly demand charges
  • Utility and state incentive capture handled for you

Up to 10 yrs

Guarantee

Permit & inspection

Includes

Available

Financing

Commercial charging

Commercial charging turns your property into an EV-ready destination.

From a few Level 2 stations to networked DC fast-charging, we design and install charging that fits your site, whether that's a workplace lot, a multifamily garage, a retail destination, or a fleet depot.

We plan for load management from day one so your electrical service can handle demand without expensive surprises down the road.

  • Workplace and employee charging
  • Multifamily and apartment charging
  • Retail and destination charging
  • Fleet depot charging with load management

Commercial charging

The economics come down to demand charges and incentive capture.

Unmanaged chargers spiking together can add utility demand fees that dwarf the energy cost. Load management software caps that spike and often changes the business case entirely.

Utility make-ready programs frequently fund the expensive infrastructure, conduit, panels, transformers, if the paperwork is filed correctly, and we build that into every proposal.

  • Managed load profiles matched to your utility's rate structure
  • Incentive applications filed as part of the project
  • Payment and access control integration
  • Planning for future expansion as adoption grows
FAQ

Common questions

Do commercial chargers qualify for incentives?

Yes, many utility and state programs cover a large share of commercial charging costs. We help identify and apply for the incentives available in your area.

Can you manage power so we don't overload our service?

Yes, we design load-managed charging that shares available capacity across stations and avoids costly demand spikes.

How long does a commercial installation take?

Timelines vary by scope, from a few days for a handful of stations to several weeks for networked, multi-station deployments with utility coordination.

Free estimate

Get a charging setup built around your home, panel, and driving habits.

Talk with a licensed electrician, get a clear recommendation, and confirm the best charger, breaker, and routing path before any work starts.